02
































  Zoom
15_10.gif (817 Byte)
Phase 4 - Garage
The Phase 4 container is basically two forty foot containers that have been put together with the center wall removed. It provides a more realistic room size fire floor. There is a smaller twenty foot container that is attached that provides a non-involved fire room that is charged with smoke and heat that leads to the involved fire room. All aspects of the Phase 1, 2 and 3 systems are put to the test here. This is the most challenging of the Swede Survival SystemsTM, providing a setting for a larger drill involving multiple tasks such as entry, rescue, suppression, ventilation, and RIT team.

Back Print e-mail to a colleague
     

Additional Information