The Dräger ERQ 3000 is a mobile air charge system which allows emergency responders and firefighters to refill their breathing air cylinder – without interrupting air supply to their SCBA. The ERQ 3000 provides operational flexibility and safety in an increasingly challenging emergency response environment.
Emergency operations in large buildings or tunnels while using SCBA have numerous challenges. Time is limited and precise air management is essential. The ERQ 3000 provides options and adds much needed operational flexibility. The ERQ 3000 can be qu … More information
ickly deployed and safely refill the air cylinder, without the need to remove the SCBA – significantly improving the safety of the emergency responders and provides options for longer operations in hostile environments.Due to its easy mobility, the ERQ 3000 can be strategically located, allowing equipment users to fill up their air cylinders at any time. The users simply need to plug in their compressed air breathing apparatus using the Quick Fill connectors to th … More information
e ERQ 3000. Within seconds, a 300 bar / 4,350 psi cylinder with a 9 litre capacity is completely filled. The charging process can be interrupt at any time by simply detaching the connection plug – giving total control to the SCBA wearer.The Dräger ERQ 3000 significantly reduces your logistic requirements. It allows one person to safely move a large volume of compressed air that can be used to refill air cylinder while the users are under protection of their SCBA. Using the latest c … More information
ylinder technology the Dräger ERQ 3000 weight has been kept to a minimum allowing the ERQ 3000 to be moved via lifts and long distance in tunnels with minimal effort.Dräger Quick Fill technology is at the heart of the operation of the ERQ 3000. This technology has been tested and proven over decades in mines rescues and escape technology.
The design is flexible and can be adapted to your requirements. This system can be fitted to a larger platform such as a response vehicle or pre placement in tunnels and large buildings.
